90% of aggregates are used within 50 miles of where they're extracted. That short, repeated haul from scale to jobsite to invoice is where the industry's time and money are made or lost.

October is Rocktober, the month the National Stone, Sand & Gravel Association (NSSGA) sets aside to showcase its members and the value of America’s aggregates industry. NSSGA’s fact sheet for this year, Aggregates by the Numbers: Economic Impact, draws on a 2025 study by the Phoenix Center for Advanced Legal & Economic Public Policy Studies. A few of its figures stand out:
- The industry generates nearly $40 billion in annual sales and employs 104,000 skilled workers.
- Every aggregates job supports another 5.95 jobs in the wider economy.
- 90% of aggregates are used within 50 miles of where they’re extracted.
The full fact sheet, with the national sales, earnings, and jobs figures, is on NSSGA’s site.
That last number is the one we keep coming back to.
A national industry, built one local haul at a time
Stone, sand, and gravel are heavy and low in value per ton, so they don’t travel far. Almost everything that comes out of a pit or quarry gets loaded onto a truck and dropped on a jobsite in the same region, often the same county.
So the industry’s $40 billion isn’t made in one big move. It’s made in thousands of short, repeated trips a day, each passing through the same handful of steps. That’s where an industry this local wins or loses its margin. Here’s what one of those 50-mile hauls looks like, and where it tends to slip.
Following one load
1. The order
A contractor needs base rock on a site tomorrow. The order goes to a supplier, the haul goes to a trucking company, and the details (material, quantity, PO, delivery window) get passed along by phone, email, or text.
Where it slips: three companies each keep their own version of the same order. When those versions drift, it surfaces days later as a billing question.
With NewMile: the order, its PO, and its line items live in one place that the contractor, hauler, and supplier all see. Contractors get simpler ordering and project and PO tracking; haulers dispatch trucks to it in a click.
2. The plant
The truck pulls in, waits, gets loaded, crosses the scale, and leaves. On a good day, that’s quick. On a busy one, trucks stack up at the gate while the loader is the bottleneck, and every minute a truck sits is a minute it isn’t hauling.
Where it slips: most plants know turn time is a problem but can’t say where the time actually goes.
With NewMile: each load is tracked by GPS (from the driver app or Samsara), so suppliers see time at location and time to load for every load. They can draw zones around the scale, the load-out, and staging, and see how long trucks spend in each one. Turn time is capacity: fix the slow zone and the same scale and loader move more tons.
3. The ticket
The scale ticket is the proof of what was hauled: material, weight, truck. Traditionally it’s a slip of paper that rides in the cab.
Where it slips: paper tickets end up in glove boxes and door pockets, or never come back at all. No ticket, no clean invoice.
One of our customers, a hauler running up to 50 trucks, told us what that looked like before NewMile. Tickets were getting lost or turned in 60 days late, and billing was completely stuck. They tried having drivers email tickets instead: drivers said they’d sent them, the office never received them, and neither side could prove it. In the end, they set up a physical drop box in the office just to have something reliable.
With NewMile: the driver photographs the ticket in the app at pickup and delivery, and the proof stays attached to that load where the office can find it. (More on that in what digital scale tickets are.)
4. The road and the drop
The truck covers its miles and drops the load at the jobsite. The contractor wants to know what’s arrived, what’s still coming, and how much of the PO is used.
Where it slips: the contractor finds out how much material landed when the invoice shows up.
With NewMile: contractors track loads in real time against their projects and POs, so they see the job as it happens, not when the bill arrives.
5. The invoice
The hauler bills the contractor. The supplier bills for the material. Someone has to match tickets to loads to invoices.
Where it slips: this is where every earlier gap lands at once: a missing ticket, a quantity that doesn’t match, an order that changed by phone. The work happened weeks ago; the money is stuck.
With NewMile: haulers invoice faster from loads that already carry their proof, and suppliers can see what went out and verify what needs to be billed. NewMile connects to QuickBooks and NetSuite, so billing doesn’t start from a stack of paper.
Why it adds up
None of those gaps is dramatic on its own. A 10-minute wait at the plant, one lost ticket, one invoice question. But multiply them by every load, every truck, and every day in an industry that runs on short hauls, and they’re a real share of the margin, for suppliers, haulers, and contractors alike.
That’s what NewMile is built for. We don’t change the stone, sand, or gravel. We connect every load, ticket, order, truck, invoice, and dollar on that 50-mile trip, so everyone working the same job sees the same picture.
One Platform. The Whole Picture.
Thanks to the people on the haul
Rocktober is a good time to thank the people who make those numbers: plant operators, scale-house teams, drivers, dispatchers, and jobsite crews. We build NewMile for them.
If you want to see what your own 50-mile haul looks like in NewMile, request a demo. Short walkthrough. No commitment.
See the whole picture on a walkthrough.
A 15-minute demo on loads, tickets, and invoices — no commitment.